CO2 Reduction Programme
Dartford Borough Council CO2 Reduction Programme for various sites.
The UK Government has enshrined new targets in law to slash emissions by 78% by 2035 and Net Zero by 2050. The drive to meet those targets translates into tighter emissions measurement and reporting requirements for Local Authorities to replace the gas fired boiler systems throughout their building portfolio.
Design
Fairfield Leisure Centre affords an opportunity for Dartford Borough Council to further reduce CO2 Emmisions by addition of ASHP for Heating and Hotwater and Solar thermal for the swimming Pool. PV Solar panel are also used to provide addition energy. This project involved 3D laser scanning of the plant room to allow a redesign of this space.
Initial properties designed
- Dartford Borough Council – circa 800kW ASHP (Replacing 4 no. CR Remeha 220 Arc 200)
- The Orchard Theatre – circa 160 kW ASHP ( Replacing 2no Ferrioli PREXTHERM RSW 399 Boilers)