Orchard Theatre Dartford

CO2 Reduction Programme

Dartford Borough Council CO2 Reduction Programme for various sites.

The UK Government has enshrined new targets in law to slash emissions by 78% by 2035 and Net Zero by 2050. The drive to meet those targets translates into tighter emissions measurement and reporting requirements for Local Authorities to replace the  gas fired boiler systems throughout their building portfolio.

Ferguson Brown’s Low Carbon designers used the base plant selection data, provided by the manufacturer, together with agreed structural reports and provided the mechanical and electrical design for the project. Providing a sufficiently detailed design solution with  co-ordination of the mechanical and electrical systems to be installed to ensure that all work and fit the existing building.

Design

Intial design  properties

  • The Orchard Theatre – circa 160 kW ASHP ( Replacing 2no Ferrioli PREXTHERM RSW 399 Boilers)