Essential electrical supplies installed into basement of Central Bristol Hospital.
Design Considerations:
- Replacement of 2 x 800 kVA oil filled transformers with 2 x 1,600 kVA air cool transformer
 - New LV switchboard and package substation Assembly
 - Re-cabling of all existing supplies with back up supply for essential medical services
 - Installation constraints due to intensive care units and critical life support requirements
 - Services such as X-rays kept to be available at all times
 - Stringent NHS regulations to be complied with.
 - Design and selection of stand-by generator back-up
 
Client: University Hospital Bristol
M&E Engineering: Ferguson Brown