The Rendezvous, Bristol
Introduction
Twenty seven apartments in first phase of four
phase £100 million development. 1st phase £3 million.
Facilities include:
- External Street lighting for whole site
- Electrical distribution package together with substation design
- Highly glazed façade required advance thermodynamic analysis to ensure Part L compliance
- Site wide Amenities includes
- CCTV cameras video entry, access control barriers
Engineering Design
Client: Persimmon Homes
Architect: Hemingway Architects Llp
M&E Engineering: Ferguson Brown
- Category: Residential