King Street London

Ferguson brown were appointed to design the MEP for 4th & 5th Floor office tenants fit-out

Ferguson Brown worked with the MEP sub contractor and main contractor to complete the MEP installation into blocks A,B,C,D,E & F.

Design Considerations

  • Heating and Hot Water
  • Drainage
  • Ventilation
  • Air conditioning
  • Small Power and Data
  • Lighting
  • Telecommunication
  • Fire Alarm and Detection System
  • Access Control

 

MEP Engineering: Ferguson Brown

Client:  Private

Main Contractor: Anvil London