Bristol Maternity Hospital Level A Plantroom
The provision of the full pipeline system drawings and schedule for St Michael’s Maternity Hospital.Replacement calorifiers and plate heat exchangers, with rationalisation of pipework and new safety platforms.
Design Considerations
- Steam
- Condense
- Natural gas – from outlet valve on Transco equipment
- Propane
- Water – raw (mains), softened, feed and reclaimed
- Compressed air
- Hot water services
- Cold water services
All pipeline systems within the plantroom were replaced whilst maintaining full operational requirements of hospital.
Client: University Hospital Bristol
M&E Engineering: Ferguson Brown
- Category: Healthcare